= SmartPhantom meeting: Tuesday 24^th^ September 2019, 11:30 BST = == Meeting details == Venue: my apologies; I did not book a room at Imperial! Perhaps JB, AK, and HTL et al can work out a convenient common location. Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. ---- == Agenda: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-18 last meeting]: * **KL**: Liaise to develop concept for polishing. * **KL**: Prepare revision to schedule for the next meeting. * **KL,AK,HTL**: Consult to specify the data recording at MedAustron. * **AK**: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note. * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. * **KL**: Email D.Nardini and I.Clark to explain the teh next steps in the programme and to request machining of carbon fibre (two frames, two connector strips). * **AK**: Purchase hard-drive to store SmartPhantom data in operation. * **KL or HTL**: Transport optical components from Imperial to RAL (LC). * **LC**: Complete detailed design of the boot. * **KL**: Send fibre invoices to HTL. * **HTL**: Provide spreadsheet with revised, precise estimate of fibre cost. * **KL**: Prepare a revised costing spreadsheet for next meeting. 2. Baseline schedule and progress against schedule: KL/HTL \\ 3. Mechanical design/manufacture update: LC \\ 4. Control system and SciWire readout update: AK \\ 5. Optical readout: JB \\ 6. Simulation/analysis update: HTL \\ 7. Spend status, discussion of outstanding requirement: KL/All \\ 8. Next steps: All \\ 9. DONM \\ 10. AoB \\ ----