= SmartPhantom meeting: Wednesday 2^nd^ October 2019, 11:00 BST = == Meeting details == Venue: my apologies; I did not book a room at Imperial! Perhaps JB and HTL et al can work out a convenient common location. Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. ---- == Agenda: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-24 last meeting]: * **KL**: Liaise to develop concept for polishing. * **Stands.** * **KL**: Prepare revision to schedule for the next meeting. * **Stands.** Agenda item. * **KL,AK,HTL**: Consult to specify the data recording at MedAustron. * **Done.** We propose: * We get a trigger from the `machine start' from the synchrotron at MedAustron. Implies we need to know the signal type and convert as necessary. * We then run the cameras in ‘video camera’ mode; * We start the readout after a delay to be determined. The delay needs to be such that the cameras start to run ‘just before’ the beam arrives. * **AK**: Invent a note numbering scheme so that HTL's note can be "published" on the wiki as a CCAP note. * **Stands.** Probably can discuss with HTL and (to coin a phrase) get it done! * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. * **Stands.** * **AK**: Purchase hard-drive to store SmartPhantom data in operation. * **Stands.** * **KL or HTL**: Transport optical components from Imperial to RAL (LC). * **Done.** * **LC**: Complete detailed design of the boot. * **Stands/Done.** * **KL**: Prepare a revised costing spreadsheet for next meeting. * **Stands.** Agenda item. * **KL**: Initiate discussion of of visit to MedAustron to review SmartPhantom design. * **Done.** Doodle at: https://www.doodle.com/poll/5fiyyik88s78tpty 2. Baseline schedule and progress against schedule: KL/HTL \\ 3. Mechanical design/manufacture update: LC \\ [raw-attachment:SmartPhantom_PrototypeUpdate.pdf Prototype Update.] 4. Control system and SciWire readout update: AK \\ 5. Optical readout: JB \\ 6. Simulation/analysis update: HTL \\ [raw-attachment:SmartPhantom_Meeting.pdf Preliminary Sr-90 Simulation.] 7. Spend status, discussion of outstanding requirement: KL/All \\ 8. Next steps: All \\ 9. DONM \\ 10. AoB \\ ----