= SmartPhantom meeting: Wednesday 23^rd^ October 2019, 11:00 BST = == Notes: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/10-16 last meeting]: * **KL**: Liaise to develop concept for polishing. * **Stands**. * **HTL**: Prepare revision to schedule for the next meeting. * **Done**. Agenda item. * **HTL**: Prepare a revised costing spreadsheet for next meeting. * **Done**. Agenda item. * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. * **Stands**. * **AK**: Purchase hard-drive to store SmartPhantom data in operation. * **Done**. Order placed * **LC**: Complete detailed design of the boot. * **Stands**. Agenda itme. 2. Mechanical design/manufacture update: LC \\ * LC reported on the [raw-attachment:2019-10-22-LC-report.pdf Potting figures]. * LC has discussed his boot concept with Cyril. Concept is to restrain resin with release tape. KL noted that for MICE a 'reservoire' of resin was created by drilling an oversize hole on the 'reverse' side of the boot. LC will also consider this. * LC has sent a drawing update has been done and sent to D.Nardini. DN is awaiting material (2mm cf sheet). * JB noted that we would also require a camera enclosure and transport case. 3. Single-fibre test setup: HTL \\ * Preparation for set-up has been completed in 527 Blackett. Some parts manufactured, still awaiting source holder a design for which had been provided to DN by HTL. * Boot design has been transmitted to DN (has also been manufactured). 4. Schedule revision discussion: All \\ * [raw-attachment:smartphantom_221019.png Revised schedule] presented. End-date looks rather too late. Need to press on next prototype. 5. Spend: outstanding requirement: All \\ * [raw-attachment:SmartPhantom_Costing.pdf Revised spend] presented. Close to break even. Can purchase enough fibre for single layer planes. * [raw-attachment:2019-10-21-PSG954_PHHE_Kenneth-Long_HTL.pdf​ Corrected spending] after it was pointed out by JB that the amount of cameras was neglected which is more than the current budget allows. * Need to make orders asap. 6. Visit to MedAustron: All \\ * **KL:** Needs to confirm detail with M.Puchalska. 7. Next steps: All \\ * Crack on with programme! 8. DONM \\ * Meet next week 11:00 GMT; 12:00 at MedAustron. * Meet at MedAustron for an 09:30 start. * **KL:** Look into Vidyo, ZOOM, or Skype for this meeting. 9. AoB \\ * None. ---- === Summary of actions: === * **KL**: Liaise to develop concept for polishing. * **HTL**: Add CCAP note number to the header of the note and post it as a CCAP note. * **LC**: Complete detailed design of the boot. * **KL:** Needs to confirm detail with M.Puchalska. * **KL:** Look into Vidyo, ZOOM, or Skype for next week's meeting. ---- == Meeting details == Venue: my office: 1105 Blackett Laboratory. Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. ---- == Agenda: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/10-02 last meeting]: 2. Mechanical design/manufacture update: LC \\ 3. Single-fibre test setup: HTL \\ 4. Schedule revision discussion: All \\ 5. Spend: outstanding requirement: All \\ 6. Visit to MedAustron: All \\ 7. Next steps: All \\ 8. DONM \\ 9. AoB \\ ----