  • Research/Instrumentation/Meetings/2019/12-18

    v2 v3  
    11= SmartPhantom meetings: Wednesday 4^th^ December 2019; 11:00 GMT =
    2 
    3 == Summary of actions: ==
    4  * **KL**: Liaise to develop concept for polishing.
    5  * **KL/LC**: Visit C.Lockett and to confirm potting arrangements.
    6  * **KL/LC**: Check that drawing pack on the WWW is up to date.
    7 
    8 == Notes: ==
    9 
    10 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/11-20 last meeting]:
    11  * **KL**: Liaise to develop concept for polishing.
    12   * **Stands.**
    13 
    14 2. Mechanical design/manufacture update: LC
    15  No update this week. \\
    16  LC will arrange for KL to visit C.Lockett tomorrow.  KL and LC will check that the drawing pack on the wiki is uptodate.
    17 
    18 3. Single-fibre/fibre-bundle test setup: HTL
    19  HTL has carried out an extended search for scintillation light excited by the ^90^Sr source from single fibre.  He has not found a signal above background in a scan over the source.  Consistent explaination is that light excited by the source is insufficient.
    20  * AK: suggests to histogram responses from a particular pixel.  HTL will pursue using the data that has been recorded.
    21 
    22  HTL now prepring a 'pig-tail' of scintillating fibre that can be illuminated by the UV LED, the source and a proton beam at Clatterbridge.
    23 
    24 4. Schedule revision discussion: All \\
    25  **Agreed** to move on to production of pig-tail and winding of clear-fibre light guides.
    26 
    27 5. Spend: outstanding requirement: All \\
    28  Outstanding items:
    29  * Cameras;
    30  * Cf for the full SmartPhantom.  We have enough for the prototype.
    31  * May also need extra fibre since we've decided to build the pig-tail.
    32 
    33 6. Next steps: All \\
    34  As above.
    35  
    36 7. DONM \\
    37  Wed. 11Dec19.
    38  
    39 8. AoB \\
    40  * We discussed the need to contact MedAustron/MedUniWien re delays.  KL will consider and take forward.
    41 
    42 ----
    432
    443== Meeting details ==
    454
    46 Venue: 1105 Blackett Laboratory.
     5Venue: No central location; Christmas SmartPhantom diaspora
    476 
    48 Videoconference using the Vidyo system. 
     7Teleconference: phone details:
     8{{{
     9 UK: 08082 380274
     10 Austria: 0800 006612
    4911
    50 Connection details: \\
    51  Please join the VIDYO meeting by clicking this link: https://vidyoportal.cern.ch/join/SPJlsfAOEV
     12 PIN: 5904750902
     13
     14}}}
     15
     16Full list of telephone contacts may be found [raw-attachment:Z0-Phone-details.pdf here].
    5217
    5318----
     
    57221. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/11-27 last meeting]:
    5823 * **KL**: Liaise to develop concept for polishing.
     24 * **KL/LC**: Visit C.Lockett and to confirm potting arrangements.
     25 * **KL/LC**: Check that drawing pack on the WWW is up to date.
    5926
    60272. Mechanical design/manufacture update: LC
     28 Including the potting of the pig-tail.
     29 
     303. Preparation of first light-guide assembly: HTL
    6131
    62 3. Single-fibre/fibre-bundle test setup: HTL
    63 
    64 4. Schedule revision discussion: All \\
    65 
    66 5. Spend: outstanding requirement: All \\
    67 
    68 6. Next steps: All \\
     324. Next steps: All \\
    6933 
    70 7. DONM \\
    71  Wed. 11Dec19.
     345. DONM \\
    7235 
    73368. AoB \\