= Design and Integration meeting: 7 March 2023 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Actions from last meeting. * Simulations. * AOB == Actions == || Actions || Description || Status || 22-12-06-04 || '''Chris Baker''' to provide a CAD model of the Gabor Lens test bench || In progress || 22-12-06-05 || '''Clive Hill''' to import the CAD model into Creo to provide a better image of the Gabor Lenses. || In progress || 23-01-17-02 || '''Ajit Kurup''' to get Dockerfiles for BDsim from Will. || Closed || 23-01-17-03 || '''Ajit Kurup''' to investigate options for storing data somewhere easily accessible for the collaboration. || In progress || 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress == Notes == Present: Neil Bliss, Clive Hill, Ajit Kurup, Ken Long, Hywel Owen, Rehanah Razak, Will Shields\\ Apologies: Jaroslaw Pasternak, Colin Whyte * Document for the 6-month review. * NB is preparing a section on the facility layout and has written a first draft. * AK: Would it be useful to include some details on the plan to address sustainability? * NB can add some details based on the work done for the CALA facility in Munich. * Discussion. * WS is getting plots together for the document, text will follow. * Discussion on the different configurations to be mentioned in the report. * CAD * NB has had discussions with Chris Baker and now has the CAD model of the lens. * CW will upload a drawing of the SCAPA target area, which will be updated with details of the tape target. * These can then be put together to present in the report. * CH showed the CAD model. * AK: Will there be any input from the vacuum group at DL. * NB: DL will wait for the CAD model to be ready before doing any calculations. * NB: If there is time we could add a bit on the general vacuum design (i.e. how the design of the facility segregates the vacuum system into sections). * KL: Rehanah will use BDSIM to look at the delivery into the end stations to produce different spot sizes, micro-beams, etc. * AK: Was looking into getting the BDSIM Docker image running. * Discussion on how best to run BDSIM. * Agreed using the version on CVMFS (available through the linux cluster)is simplest. Using Docker can be looked at in the future if there is a strong need for it. * NB to add more detail to the infrastructure section and Hywel will add to the Overleaf when it's ready. * Sections * Infrastructure * Design and simulations * AK: Should we add a section on the RF? We can outline the key parameters and the technology choices being considered. * Discussion. * AK to outline current technology choices. * AK to add subsection headings to document.