= Design and Integration meeting: 01 August 2023 15:30 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Actions from last meeting. * Simulations. * Preparation for the baseline update. * AOB == Actions == || 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress || 23-07-25-01 || '''Neil, Clive, Colin''' Determine the thickness needed for the radiation shutter. || Open == Notes == Present: Neil Bliss, Clive Hill, Mark Johnson, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Rehanah Razak, Colin Whyte\\ Apologies: Hywel Owen, Lilli Platt, Will Shields * Simulations * Slides from JP * Analytic field map with doublet FF focussing. * Able to obtain the initial working point. * Constant tune as a function of KE. * Betatron functions. * New parameter list. * New lattice allows for large variation of vertical tune. * CAD * Details shown by CH on the layout of stage 1. * JP: Distance between len 3 and 4 is critical. Distance between lens 2 and 3 can be adjusted. * Further work on the target chamber shown by CH. * NB: Progress on FETS FFA engineering details. These details are relevant for LhARA. * CH is looking at the vacuum chamber. * Need to have strengthening ribs and bellows. * This requirement has led to an increase in the magnet gap size. * NB: Costing * Looking at adding detail to the costing detail used in the PA2 proposal. * Discussion. * AOB * JP: question for CH. What is the size of the wall after lens 2 and is there a shutter? * Nominally 0.5m * Is the gap on the current diagram sufficient? * Need to do a radiation study. * The size of the wall is important for the injection line. * RR: Message from WS re submitting an abstract for the NPL workshop. * Consensus is if WS can submit one then that is good.