= Design and Integration meeting: 15 August 2023 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Actions from last meeting. * Simulations. * Engineering. * AOB == Actions == || 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress == Notes == Present: Neil Bliss, Clive Hill, Mark Johnson, Ajit Kurup, Keith Middleman, Jaroslaw Pasternak, Lilli Platt, Rehanah Razak, Will Shields, Colin Whyte\\ Apologies: Ken Long, Hywel Owen * Keith Middleman senior vacuum design engineer * Looking at the gas flow through the target vessel interface with the first gabor lens. * Using MOLFLOW+ (free software for accelerator vacuum modelling ). * Looked at gas desorption from the target in a diffuse scenario and for different narrower angular spreads. * CW: Would be good to do an experiment. * From the simulations it looks like the vacuum should be OK but depends on how strong the beaming affect is. * Need to also consider gas desorption from the other surfaces of the target vessel. * KM will prepare a paragraph and the tables for the design review. * Engineering update - NB * Meeting tomorrow in Strathclyde to discuss target configurations. * Further FEA work on the FETS vacuum chamber. * Looking at trying 8mm wall thickness instead of 10mm by including radii in the corners to reduce stress. * Power consumption * Schematic update. * Need reference design for profile monitor and the cavity to determine if the gap between lenses 2 and 3 is realistic. * JP to provide cavity dimensions. * AK to ask FETS for details of profile monitor. * WS will ask IBA for details of their profile monitors. * WP5 are charged with beam instrumentation. * Discussion on position of the collimators. * One after Gabor lens 3 * One just before the vertical bend * One half way along the vertical arc. * Slide from CH on the schematic. * Adjustment of the positions of the Gabor lenses. * Length between lenses 3 and 4 is critical. * Simulations * Slides on end station dose from WS * File that was found does not have the correct input beam so it looks like the data used in the pre-CDR was lost. * New BDSIM model * Uses slightly different physics list. * 12.2 Gy/shot instead of 12.8 Gy/shot quoted in the pre-CDR. * Slides from LP on octupole and collimator optimisation. * Details from JP on FFA design. * Found working point for high-intensity operation by using a small D (instead of a small F doublet)