Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2023/2023-08-22


Ignore:
Timestamp:
Aug 22, 2023, 9:36:45 PM (15 months ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2023/2023-08-22

    v1 v2  
    99* Engineering.
    1010* AOB
     11
     12== Actions ==
     13|| 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress
     14
     15== Notes ==
     16Present:  Neil Bliss,  Clive Hill, Ajit Kurup,  Ken Long, Jaroslaw Pasternak,  Rehanah  Razak,  Will Shields, Colin Whyte\\
     17Apologies:   Mark Johnson, Hywel Owen
     18
     19        * Simulations
     20                * Update from JP:
     21                        * Updated diagram of the ring.
     22                                * Need to add details of the yoke.
     23                        * Contour plot of Total B vs R and opening angle. Plot of B vs opening angle.
     24                        * Need to add the injection line
     25                * Slides from WS.
     26                        * Update on optics optimisation.
     27                        * Lilli Platt has now finished.
     28                        * GPT solution does not converge for spot sizes sigma=2cm or less.
     29                        * Discussion with Tony Price, suggested smaller spot sizes not needed.
     30                        * KL: We should provide smaller spots sizes but not necessary to deliver in the beam line, can use final focussing elements in the end station.
     31                        * CW: Also having discussions with Tony regarding what measurements should be done for the end station.
     32                        * Discussion on what should go in the 12 month report.
     33                                * Should reference a technical note.
     34                                * NB: Better to add the detail directly into the report for visibility.
     35        * Engineering
     36                * Update on the schematic based on WS's comment.
     37                        * Ross Gray is keen on the vertical arrangement of the laser.
     38                        * Investigating having the laser beam at 25 degrees following suggestion from Ross.
     39                        * Discussion on effect of the beam energy due to different incident angle and flexibility for different target production mechanisms.
     40                        * NB would like comments on the schematic.
     41                        * JP: FETS uses wire scanners for profile measurements.
     42                        * Discussion on profile monitor technology.
     43                       
     44                * Reference design for the bunching cavities.
     45                        * JP: Calculated the details of the cavity. Need to dig these out.
     46                * Schematic from CH showing the 25 degree target angle. Incoming laser angle is now 40 degrees.
     47                * Meeting tomorrow on power consumption.
     48               
     49