= Design and Integration meeting: 22 August 2023 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Actions from last meeting. * Simulations. * Engineering. * AOB == Actions == || 23-01-24-01 || '''All''' to prepare document for the milestone to update the baseline || In progress == Notes == Present: Neil Bliss, Clive Hill, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Rehanah Razak, Will Shields, Colin Whyte\\ Apologies: Mark Johnson, Hywel Owen * Simulations * Update from JP: * Updated diagram of the ring. * Need to add details of the yoke. * Contour plot of Total B vs R and opening angle. Plot of B vs opening angle. * Need to add the injection line * Slides from WS. * Update on optics optimisation. * Lilli Platt has now finished. * GPT solution does not converge for spot sizes sigma=2cm or less. * Discussion with Tony Price, suggested smaller spot sizes not needed. * KL: We should provide smaller spots sizes but not necessary to deliver in the beam line, can use final focussing elements in the end station. * CW: Also having discussions with Tony regarding what measurements should be done for the end station. * Discussion on what should go in the 12 month report. * Should reference a technical note. * NB: Better to add the detail directly into the report for visibility. * Engineering * Update on the schematic based on WS's comment. * Ross Gray is keen on the vertical arrangement of the laser. * Investigating having the laser beam at 25 degrees following suggestion from Ross. * Discussion on effect of the beam energy due to different incident angle and flexibility for different target production mechanisms. * NB would like comments on the schematic. * JP: FETS uses wire scanners for profile measurements. * Discussion on profile monitor technology. * Reference design for the bunching cavities. * JP: Calculated the details of the cavity. Need to dig these out. * Schematic from CH showing the 25 degree target angle. Incoming laser angle is now 40 degrees. * Meeting tomorrow on power consumption.