= Design and Integration meeting: 6 February 2024 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Simulations. * Engineering. * AOB == Actions == == Notes == Present: Andy Goulden, Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Anna Vikhoreva, Colin Whyte \\ Apologies: Ken Long, Hywel Owen * Simulations * Update from WS: * stage 1 injection line optimisation with space charge to achieve required injection conditions. * Gabor lens in BDSIM. * Physical geometry elements are in place. * Need to add fields. * JP: Details from CH on diagnostics and correctors to be added to the optics simulation. * TJK: * Power calculation after gap height reduction. * Currents have not been optimised but have come down by about half. * Still over the limit. * AG: About 35% of the power is needed for cooling so total power requirement would be of the order of 4 MW. * CH: FETS substation is only about 1.25MW * Longitudinal phase space. * AK to look into this. * CW: reminder re upcoming milestone and report. * CH: * Emailed Bradley Kirk and got CAD model for the FETS FFA RF cavity. Also got some details on beam diagnostics. * Would like clarification on what level of detail needs to go in the report. * CW: Deliver the concept and a plan for the FFA but not an engineered solution. * Discussion on what detail should into the FFA part of the report. * Agreed to write up what has been done and where the design is now. Focus is on stage 1. * Discussion re what deliverables should go into the bridging funds request. * Engineering - CH * Update on coil layout in CAD. * 10 nested coils with terminations. * Expectation is that the assembly is potted. * CW: Plenty of detail already done and it might be useful to talk to a manufacturer at this point to see what they think.