= Design and Integration meeting: 13 February 2024 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Simulations. * Engineering. * AOB == Actions == == Notes == Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte \\ Apologies: Andy Goulden, Hywel Owen * Simulation * Slides from WS: * Stage 1 optimisation. Now have a beam (with smaller beta and alpha close to 0) that can get through the injection line and match to the injection conditions. * Gabor lens model in BDSim. * Geometry details done. * EM Field * electric field only. * Solenoid field is more complicated to implement. * TJK: Will work on optimisation so that the field produced by the trim coils add to the field of the main coil. * Looking at checking JB's code Fixed Field. * Slides from JP: * Including correctors and beam profile monitors in the injection line. * Assumptions for the gap calculation. * This will give the good field region needed and then can do the magnet simulation. * Discussion on the gap size. * TJK concerned about the dB/B requirement. * Engineering * Template for the documents for milestones 6 and 7. * Power requirements for the magnets. * Discussion on power requirements for the FETS FFA magnet and comparison with LhARA. * AOB * KL: How is the JAI work is going? * MP: Looking at the conceptual design of stage 1 beam delivery in the end station. Lattice design and spot sizes and looking at different magnet options. To be presented in about 5 weeks.