= Design and Integration meeting: 20 February 2024 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Simulations. * Engineering. * AOB == Actions == == Notes == Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Will Shields, Colin Whyte \\ Apologies: Andy Goulden, Ken Long, Hywel Owen, Rehanah Razak * Simulations * Update from WS: * GPT being very slow. * Got a version of TraceWin * Gabor lens field map in BDSim * Update from JP * Update of magnet parameters circulated by email. * Discussion * requirement on delta_k/k can be relaxed if there's no need for slow extraction. * Coil configuration and construction - TJK * Update from MP: * Prelim studies on the RF cavity after the end station nozzle * Dipole and quad design in progress. * Engineering - CH * Update to injection line layout. * Discussion on location of profile monitors. * CW: Are the stray fields from the correctors an issue? * JP: Quads are narrow so it should be OK * Had a meeting with FETS-FFA and magnet designers re building the magnet * JP: Magnet was made for the ion beta project at KURNS. Should look up what they did. * Need details of materials for bulk shielding calculations * Discussion re nozzle material. * Stainless is probably the favoured choice. * AK to ask Chris Densham for guidance on what materials to use. * AOB * Discussion on schedule for writing the report for March milestone. * Can refer to 12 month report and just provide updates in the milestone report.