= Design and Integration meeting: 27 February 2024 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Simulations. * Engineering. * AOB == Actions == == Notes == Present: Andy Goulden, Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte \\ Apologies: Jaroslaw Pasternak * Simulations * Slides from WS * Comparison of tracking with different Gabor lens models. * Slides from KL * Different source models. * Comparison of solenoids and Gabor lenses * Looked at different beam pipe diameters. * First go of the LhARA magnet * TJK showed Opera model * Engineering * CH: working on update of the schematic of the transfer line. * Milestone report - CH * Text on the controls from Graham Cox. * Building concept hasn't changed much so will refer to 12-month report. * Update on shielding calculations. * Vacuum concept section in progress should be ready soon. * Power consumption has not changed so will refer to the 12-month report. * RF * Not much has changed. Will look to see what was written in the 12 month report and update that. * CH has got a CAD model of the RF cavity from Rob Matheson. Can add that to the report. * CH can progress the write up and present next week. * AOB * WS: early bird deadline for IPAC is tomorrow.