= Design and Integration meeting: 07 May 2024 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Milestone Report * Simulations. * Engineering. * AOB == Actions == == Notes == Present: Clive Hill, Mark Johnson, Ta-Jen Kuo, Ajit Kurup, Hywel Owen, Matt Pereira, Will Shields, Colin Whyte \\ Apologies: Andy Goulden, Ken Long, Jaroslaw Pasternak, Rehanah Razak * Milestone report * Just need to transfer the milestone report to the 18th month. * HO: need to add the drawing of the cavity. * CH to check the CAD file. * Simulation * WS: * Working on the IPAC paper * Looking at beam size in the injection line. * Discussion regarding size of the beam, dispersion and beam distribution. * TJK: * Field clamp design. * Looked at attaching the clamp to the yoke. * Engineering - CH * Showed the cavity CAD models. Ferrite won't fit as it is. MA should * Looking at injection line. * Need details of the septum. Looked at the EMMA design. * Space constraint for the septum and the large injection angle. There is space for a magnet 450mm wide. * AOB