Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2024/2024-05-21


Ignore:
Timestamp:
May 28, 2024, 12:16:28 PM (6 months ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-05-21

    v1 v2  
    88* Simulations.
    99* AOB
     10
     11== Actions ==
     12
     13== Notes ==
     14Present:    Mark Johnson, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Matt Pereira, \\
     15Apologies:   Clive Hill, Andy Goulden,  Jaroslaw Pasternak,  Rehanah Razak, Will Shields,  Colin Whyte
     16
     17        * Engineering
     18                * HO: showed details on the injection from Clive.
     19                * MJ: prelim calculation of the field required the septum, will need just over 1T.
     20                * HO showed a paper on the LEAR septum
     21                        * 0.24T and 7.7mm thickness
     22        * Simulations
     23                * TJK: looking at FETS radial sector magnet to be prototyped.
     24                * MP: Looking at the octopole in stage 1 to improve beam uniformity in the end station.