= Design and Integration meeting: 25 June 2024 15:00 GMT = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Preparation for the final report. * Engineering. * Simulations. * AOB == Actions == == Notes == Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Hywel Owen, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte \\ Apologies: Andy Goulden, Mark Johnson, Ken Long, * Final report * Collab meeting in beginning of Sept. Aim is to have the report ready for then for discussion. * High-energy line. * JP: Optics design exists. * CH: Details of this is needed. * WS: Working on this and will send details to CH soon. * JP: Waiting for trackable field map of the FFA and can then finalise the transfer line and injection. * Engineering - CH * Slides from last week on the injection line. * Need details of the kicker * Sketching the coils of the LhARA magnet in CAD (similar to what was done for the FETS-FFA magnet). * Showed details from Emi's presentation on diagnostics to see how we could use this for LhARA. * Potential issue with the length of the BPM and wall current monitor. * JP: diagnostics will have to be inclined to make them fit. * Simulations * TJK showed slides on the magnet yoke and clamp optimisation. * WS: working on injection line. * AOB