= Design and Integration meeting: 02 July 2024 15:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Preparation for the CDR. * Engineering. * Simulations. * AOB == Actions == == Notes == Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte \\ Apologies: Andy Goulden, Mark Johnson, Hywel Owen * Engineering * Update from CH * Schematic has been updated with new yoke design. * Need to address collisions with the injection region and where the injection line crosses the FFA beam pipe. * Meeting to discuss FFA issues scheduled for 16th July. * Discussion on how the yoke geometry can be modified to accommodate the injection septum. * Preference is to go with the previous version. * Modelling of the trim coils. * Detailing of the connections and manifolds. * JP: Need to update a drift length in the high energy transfer line design before finalising. * Simulations * TJK: * Produced field map for JP to track. * Update on the power requirement 20kW for 1 half of the magnet. * WS: * Looking at using linear optics code beam. * Comparable to the SCAPA beam. * Looking the modelling the injection line in GPT. * KL: how long does generating the beam? * WS: Of the order of half an hour for 1e6 particles. * AOB