= Design and Integration meeting: 09 July 2024 15:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Engineering. * Simulations. * AOB == Actions == == Notes == Present: Clive Hill, Mark Johnson, Ta-Jen Kuo, Ajit Kurup, Ken Long, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte \\ Apologies: Andy Goulden, Hywel Owen * Engineering - CH * More details on connections and update on power requirements from Steve Griffiths * Means we can have different size conductors depending on the power required for each coil. * Updated details on the high energy line using info from WS * Issue with the first quad overlapping with the FFA. * JP: septum field can only be increased a little from 1.12T to 1.2T * Discussion. * TJK showed alternative yoke shapes and the impact on the injection and extraction was discussed. * Simulations * WS showed update on different input beams. * JP: would like the most recent version of the input file. * WS: Looking at using a permanent magnet just after the target. * discussion * AOB