Design and Integration meeting: 16 July 2024 15:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB
Actions
Notes
Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Ken Long, Hywel Owen, Matt Pereira, Rehanah Razak, Will Shields, Colin Whyte
Apologies: Andy Goulden, Mark Johnson, Jaroslaw Pasternak
- Engineering
- CH showed slides on engineering issues to be addressed.
- Discussed some of these issues.
- Agreed to fix the circumference of the ring and magnet layout.
- Agreed to write down outstanding issues, the implications of these and options for addressing these in the CDR.
- Discussed some of these issues.
- CH showed slides on engineering issues to be addressed.
- Simulations
- TJK showed slides on tracking simulations using the code FixedField and the field map produced by Opera.
- AOB
- CDR
- HO showed the outline of the CDR in Overleaf
- Discussed how to prepare the content.
- AK: Is there a date agreed for the design to be frozen?
- CW: This should be done as soon as possible
- HO showed the outline of the CDR in Overleaf
- CDR
Attachments (1)
- 16-07-24-1272-pa1-meng-prs-0021 v1.0 FFA Ring.pptx (13.6 MB ) - added by 4 months ago.