= Design and Integration meeting: 30 July 2024 15:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Engineering. * Simulations. * AOB == Actions == == Notes == Present: Clive Hill, Ta-Jen Kuo, Ajit Kurup, Jaroslaw Pasternak, Matt Pereira, Rehanah Razak, Will Shields \\ Apologies: Andy Goulden, Mark Johnson, Ken Long, Hywel Owen, Colin Whyte * Engineering * CH went over the slides from the meeting 2 weeks ago. Discussed the questions on Clive's slides. * JP had meeting with RAL group last week. * BPM should be no more than 10cm in length. * Elements (including the RF cavity) can be tilted wrt to the radial direction without any significant effect. * TJK: New design of the magnet has an increased spiral angle and the field index has decreased. Will have an impact on the space available. * Discussion re how the design will change and how to present this in the CDR. * CH showed an FEA simulation of the vacuum chamber and areas of increased deflection. * Centre of the chamber needs to be strengthened. * Simulations * WS: ongoing studies using the beam produced by Ken's code.