= Design and Integration meeting: 08 October 2024 16:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * CDR Status * Engineering. * Simulations. * AOB == Notes == Present: Clive Hill, Will Shields, Colin Whyte, Jaroslaw Pasternak, Hywel Owen, Matt Pereira, Rehanah Razak, Ken Long Apologies: Ta-Jen Kuo * CDR status * JP: highlighted missing chapters/content. Missing chapter to wrong .tex file name. * JP: Vacuum value discrepancy between FFA & stage 2 beam line, value change to 10^-8 in high energy beam line * JP: highlighted reference & typo issues. * WS: to add layout to intro section of WP6 chapter. * Engineering * No updates * Simulation * WS: no update * JP: New FFA diagram in CDR * JP: Space between magnets for cavities. * Discussion on angled cavities - they should introduce behaviour like a cyclotron, transverse oscillations that cancel out turn by turn unless there's a resonance. This should be acceptable. * The no. turns are also comparable to cyclotron (~1000 cyc. to 10000 FFA) * JP: potential problem still exists in the proximity of the FFA magnets to the MA cavity core. * JP: Kickers may still be a concern, they may need making shorter & stronger. * Worst case, 2 kickers will be needed instead of 1. * Maximum field on ferrite cavity should be kept < 0.05T (from kicker field) - could be challenging. * TJK to extend the good field region of the FFA magnet to cover 15 MeV beams in BP1 phase. * JP: FFA dynamic aperture study added to CDR. * AOB * WS to ask Hywel for PMQ geometry * 420 T/m field limit