Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2024/2024-10-15


Ignore:
Timestamp:
Oct 15, 2024, 4:36:14 PM (7 weeks ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-10-15

    v1 v2  
    1010
    1111== Notes ==
    12 TBC
     12Notes:
    1313
     14Present: WS, JP, TJK, MP, KL, CH
     15
     16Apologies: HO
     17
     18Absent: RR, CW
     19
     20* CDR status
     21        * JP: highlighted blue picture that needs addressing
     22        * WS: added accelerator schematic diagram & rearranged figures to be on the correct pages.
     23        * JP: possible publication in PRAB for CH6 content.
     24
     25* Engineering
     26        * CH waiting on RG for engineering details for PoPLaR
     27
     28* Simulation
     29        * JP: Working on injection line. Issues with plotting.
     30        * WS: BDSIM bug hunting
     31        * MP: Waiting on RR for lattice.
     32
     33* AOB:
     34        * WS: IPAC 2025 (Taiwan) abstracts opened, should consider student contributions.
     35