= Design and Integration meeting: 12 November 2024 16:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Engineering. * Simulations. * AOB == Notes == Notes: Present: WS, CH, KL, MP, RR, JP, TJK Absent: HO, CW * Engineering * No updates. * Simulation * MP: Uniformity limited to sqrt(2 x pi) of the incoming beam size (see attached slides). Will impact transmission in beam delivery. * TJK: Scaled field down to get larger GFR. Clamp height varying, good ring tune observed. Will investigate tune for lower energies (~7 MeV). * RR: Prepping for IC meeting(s), aiming to present next week.