Version 4 (modified by 3 weeks ago) ( diff ) | ,
---|
Design and Integration meeting: 19 November 2024 16:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Engineering.
- Simulations.
- AOB
Notes
Present: WS, CW, MP, RR, JP, TJK, HO, CH, KL
- Engineering
- No updates
- Simulation
- TJK: Good low energy tune at 7 MeV, Re-engage Clive on FFA engineering, Improvement in power consumption - down to synchrotron levels, Ta-jen to send field to JP
- MP: Working on smaller beam sizes with end station quad configurations.
Note:
See TracWiki
for help on using the wiki.