Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2024/2024-12-03


Ignore:
Timestamp:
Dec 10, 2024, 11:14:12 AM (12 days ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2024/2024-12-03

    v1 v2  
    1 = Design and Integration meeting: 12 December 2024 16:00 BST =
     1= Design and Integration meeting: 03 December 2024 16:00 BST =
    22
    33'''Zoom:''' https://ukri.zoom.us/j/99571436156
     
    99
    1010== Notes ==
    11 Present: TBC
    12 Absent: TBC
     11Present: WS, MP, RR, TJK, KL, JP, CH
     12Absent: HO, CW
    1313
    1414* Engineering
    15         * TBC
     15        * No updates.
    1616
    1717* Simulation
    18         *TBC
     18        * TJK: Planning full 10 cell simulations for cross-talk between magnets.
     19        * RR: Running quadrupole triplet model
     20        * JP:
     21                * New optics for injection line, will circulate.
     22                * Field limit in cavity in FFA FT3M material cavity core < 100 Gauss
     23                * FT3L material is less stringent
     24 
     25* Simulation
     26        * WS to write IPAC abstract
    1927
    20