Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2024/2024-12-03
- Timestamp:
- Dec 10, 2024, 11:14:12 AM (12 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2024/2024-12-03
v1 v2 1 = Design and Integration meeting: 12December 2024 16:00 BST =1 = Design and Integration meeting: 03 December 2024 16:00 BST = 2 2 3 3 '''Zoom:''' https://ukri.zoom.us/j/99571436156 … … 9 9 10 10 == Notes == 11 Present: TBC12 Absent: TBC11 Present: WS, MP, RR, TJK, KL, JP, CH 12 Absent: HO, CW 13 13 14 14 * Engineering 15 * TBC15 * No updates. 16 16 17 17 * Simulation 18 *TBC 18 * TJK: Planning full 10 cell simulations for cross-talk between magnets. 19 * RR: Running quadrupole triplet model 20 * JP: 21 * New optics for injection line, will circulate. 22 * Field limit in cavity in FFA FT3M material cavity core < 100 Gauss 23 * FT3L material is less stringent 24 25 * Simulation 26 * WS to write IPAC abstract 19 27 20