= Design and Integration meeting: 18 February 2025 15:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Engineering. * Simulations. * AOB. == Notes == Present: CH, WS, MP, JP, TJK Absent: HO, KL, CW, RR * Engineering * CH re-raised issue with injection line intersecting the FFA magnets. JP agreed to send layout files to CH. * Simulation * WS: GPT issues. Either reading out or model construction, likely reading. Simulation w/o space charge took ~30 mins, simulations with space charge will be time consuming. * MP: Still debugging solenoid field maps. * TJK: see slides. * AOB