= Design and Integration meeting: 18 March 2025 15:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * Collaboration Meeting Agenda * Engineering. * Simulations. * AOB. == Notes == Present: WS, KL, MP, CH, TJK, MP Absent: RR, CW, HO * Collaboration Meeting Agenda * WS (20) RR + MP (10) on stage 1 / FFA injection line (30 mins), JP on FFA (20), TJK on FFA magnet (20), CH on engineering (20). * Engineering * CH to send Creo CAD to WS (for GERF). TJK to send latest FFA magnet step file to CH). * Simulation * WS: No update (writing FFA review document). * MP: quick update on uniformity, using incorrect file, slides to be presented next week. * TJK no sim update, showed photos of FETS FFA magnet prototype + coil windings. * AOB * JP: Can move back to 4pm after next week. Re-assess at CM7. * TJK: Available to present at IPAC. WS to add TJK to authors.