Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-03-25


Ignore:
Timestamp:
Apr 1, 2025, 11:24:44 AM (3 days ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2025/2025-03-25

    v1 v2  
    99
    1010== Notes ==
    11 Present:
    12 Absent:
     11Present: HO, WS, JP, RR, TJK, MP
     12Absent: CW, KL
    1313
    1414* Engineering
     15        * No updates. CH no longer working on LhARA (will present at CM)
    1516* Simulation
     17        * HO showed measured PMQ field map. HO to send field map to WS.
     18        * RR at IOP, MP to present work at CM.
     19        * JP sent updated FFA position w.r.t. switching magnet.
     20        * WS to send CM agenda to KL/RA
    1621* AOB
     22        * TJK agrees to be speaker for LhARA IPAC contribution.
    1723
    1824
     25