Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-05-13


Ignore:
Timestamp:
May 14, 2025, 4:33:02 PM (26 hours ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2025/2025-05-13

    v1 v2  
    99
    1010== Notes ==
    11 Present:
    12 Absent:
     11Present: HO, WS, RR, TJK, MP, CD
     12Absent: CW, KL, JP
    1313
    1414* IPAC Paper
     15        * All co-authors received the latex file from WS. All asked to complete their contributions as soon as possible.
     16        * RR agreed to print the conference poster at IC for TJK to present.
    1517* Simulation
     18        * TJK: Further modifications made to the field clamps to reduce the tune spread. Ongoing. Images showed of the FETS FFA prototype magnet.
     19        * RR: LhARA talk well received at IOP. Ongoing work focusing on debugging LhARALinearOptics model.
     20        * MP: Good residuals now seen between BDSIM and GPT field maps. GPT tracking precision was limited to default of 1e-6.
     21        * WS: No update, GERF priority.
    1622* AOB
     23        * IOP upcoming (July), LhARA should submit a contribution.
     24