= Design and Integration meeting: 13 May 2025 15:00 BST = '''Zoom:''' https://ukri.zoom.us/j/99571436156 == Agenda == * IPAC Paper * Simulations. * AOB. == Notes == Present: HO, WS, RR, TJK, MP, CD Absent: CW, KL, JP * IPAC Paper * All co-authors received the latex file from WS. All asked to complete their contributions as soon as possible. * RR agreed to print the conference poster at IC for TJK to present. * Simulation * TJK: Further modifications made to the field clamps to reduce the tune spread. Ongoing. Images showed of the FETS FFA prototype magnet. * RR: LhARA talk well received at IOP. Ongoing work focusing on debugging LhARALinearOptics model. * MP: Good residuals now seen between BDSIM and GPT field maps. GPT tracking precision was limited to default of 1e-6. * WS: No update, GERF priority. * AOB * IOP upcoming (July), LhARA should submit a contribution.