Changes between Version 5 and Version 6 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-10-13
- Timestamp:
- Oct 13, 2025, 3:22:51 PM (6 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2025/2025-10-13
v5 v6 17 17 * AOB 18 18 * JP: A number of issues in the CDR need correcting: 19 * Pg. 8; there should be no specified number of RF cavities. Five is only in the schematic diagram & has no physical basis for being that number.19 * Pg. 8; there should be no specified number of RF cavities. There are five only in the schematic diagram, there is no physical basis for that number to be included. 20 20 * Pg. 9; eqn 2.1 units are not correct. The E_I term should be mass, not energy. 21 21 * Pg. 10 (2.2.3 paragraph 2); the β0 equation is wrong, the r.h.s. should be p_0 c/E_0. … … 40 40 * Pg. 37; table 2.14 should be removed, it's repeating 2.12. The reference to the table on page 36 should be updated to 2.12. 41 41 * Pg. 42 (2.4.5 paragraph 2); equation β=p/E is wrong, should be β=pc/E, 42 * Pg. 51 (2.5.4 paragraph 2); the foll woing sentences are not correct & must be removed:42 * Pg. 51 (2.5.4 paragraph 2); the following sentences are not correct & must be removed: 43 43 {{{ 44 44 The design of the FFA magnet requires the kicker magnet to bend the beam by 90◦, such a magnet is feasible is wrong.