Version 1 (modified by 6 days ago) ( diff ) | ,
---|
Design and Integration meeting: 13 October 2025 11:00 BST
Zoom: https://ukri.zoom.us/j/99571436156
Agenda
- Simulations.
- AOB.
Notes
Present:
Absent:
- Simulations
- AOB
Attachments (2)
-
B_field_map_LhARA_spiral_54_cut_clamp_8_13_both_overlapped.txt
(58.4 MB
) - added by 6 days ago.
LhARA field map 15-127 MeV
-
B_field_map_LhARA_spiral_54_two_thirds_cut_clamp_8_12_both_overlapped.txt
(58.4 MB
) - added by 6 days ago.
LhARA field map 7-57 MeV
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.