Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2025/2025-11-24
- Timestamp:
- Nov 25, 2025, 2:25:58 PM (13 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2025/2025-11-24
v1 v2 8 8 9 9 == Notes == 10 Present: \\11 Absent: \\10 Present: WS MP CW KL\\ 11 Absent: HO RR JP TJK MMC\\ 12 12 13 13 * Simulations 14 * 14 * MP re-presented his slides from last week. B_r parameter in PMQ strengths for 1.2T is reasonable. 15 * KL to track C12 ions, currently debugging. 15 16 * AOB 16 * 17 * IPAC discussion. To be raised at PoPLaR meeting. 18 * MP needs wiki permissions. 17 19 18 20 … … 20 22 21 23 24
