Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2026/2026-03-09
- Timestamp:
- Mar 16, 2026, 10:12:48 AM (6 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/DesignAndIntegration/Meetings/2026/2026-03-09
v1 v2 8 8 9 9 == Notes == 10 Present: \\11 Absent: \\10 Present: MMC MP KL CW WS 11 Absent: HO JP TJK 12 12 13 13 * Simulations 14 * 14 * MMC: 15 * Showed results with full distribution, good agreement with MADX and BDSIM seen. 16 * Issue with solenoid fringes. Can be matrix tracking or fields. Check for self-consistency. Still investigating. 17 * Continue with solenoid fields - will migrate to Gabor Lens fields. 18 * Dipoles still have a tilt issue. 19 * Issue with solenoid fringes. Still investigating. 20 * MP: 21 * Doing phase space study at the energy selection collimator location. To present next week. 15 22 * AOB 16 * 23 * None
