Changes between Version 2 and Version 3 of Research/LhARA/DesignAndIntegration/Meetings/2026/2026-05-11


Ignore:
Timestamp:
May 11, 2026, 12:10:27 PM (4 days ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2026/2026-05-11

    v2 v3  
    99
    1010== Notes ==
    11 Present: \\
    12 Absent:  MP \\
     11Present: RR WS CW TJK MMC \\
     12Absent:  MP HO KL JP \\
    1313
    1414* Simulations:
    15         *
    16 * IPAC paper:
    17         *
     15        * MMC - Update on BDSIM RF Track strategy, kick map may be a useful strategy, will need to be run to test validity,
     16        * RR - shown dipoles working for spot scanning. Now working on their integration into quad minibeam scheme. Quad optimisation needed, RR to speak to MC re bayesian optimsation with BDSIM.
     17        * TJK - thesis. RAL doing magnet tests but have found water leaks, progress halted.
     18* IPAC paper & poster:
     19        * Paper & poster circulated. Awaiting feedback. HO looking at poster.
    1820* AOB
    19         *
     21        * 3D printing discussion.