| Version 2 (modified by , 2 days ago) ( diff ) |
|---|
Design and Integration meeting: 14 Sept 2026 11:00 BST
Zoom: https://us06web.zoom.us/j/9842827712?pwd=Q1Nzd0RaVkc3SEtpaGJzaWZxSTh3QT09
Agenda
- Simulations
- Publications
- Resource planning
- AOB
Notes
Present: MP MMC WS JP
Absent: HO CW KL
- Simulations:
- MP: slides - RF simulations show that beams in 200 MHz cavities extend beyond linear region & over peaks. 100 MHz is better, calculated 73 MHz and lower to be optimal. Clear statement should be made on cavity performance & requirements.
- MMC: First simulations of FFA - 50 turns. Good optics - see slides.
- Publications:
- No updates.
- Resource planning:
- No updates.
- AOB
- Active lens shown at workshop is interesting - IC masters student project.
- WS to send poster template to MMC.
Attachments (2)
- 260914_MP_S1_RF.pptx (2.9 MB ) - added by 2 days ago.
- MMC_LhARA_140926.pdf (951.5 KB ) - added by 2 days ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.
