  • Research/LhARA/GERF25/Meetings/2025-04-02

    v6 v7  
    2525 Topics: \\
    2626  - CNRS/Santiago/EU                : AFR/KL/All
    27   - Extended reality                : WS
    28   - 3D model                        : WS
     27    - No update. AFR to meet with EM and Yolanda on Friday. **Action**: Draft up timeline with principal milestones and follow up with KL following the discussion on Friday.
     28  - Extended reality                : WS (Email update)
     29    - Unable to deliver the AR activity, due to lack of time/resources. VR activity goes ahead as planned. Need to consider an alternative method for surveying visitors. **Action**: Draft up timeline with principal milestones and provide a cost estimate.
     30    - Equipment list (not final):
     31      - Padded seat with back rest (in a 2x2m space)
     32      - Optical / lens cloths
     33      - Wet wipes (cleaning between visitors)
     34      - Power point for continuous supply (2-3 hrs on battery is insufficient)
     35  - 3D model                        : WS (Email update)
     36    - Propose components have magnetic base (magnetic tape), to be assembled on a magnetic whiteboard.
     37    - Equipment list (not final):
     38      - 1m x 1.2m (or similar) magnetic white board to be laid flat on a table
     39      - Table (needed for lego model anyway)
     40      - Whiteboard pens
     41      - Metre stick (drawing LhARA outline on the whiteboard)
     42      - Whiteboard eraser
     43    - **Action** Draft up timeline with principal milestones and provide a cost estimate.
    2944  - Lego model                      : KG, WS
    30   - Eve Chair                       : ST, TU
     45    - Started work based on the CAD model. Initial cost estimate £63. Estimate the whole process to take no more than a month, but currently prioritising the video. After the LEGO model is complete and more accurate cost estimate, to ask STFC if they provide funding support.
     46    - **Action** To define timeline, update cost estimate, identify STFC funding support.
     47  - Eve Chair                       : ST, TU (Email update)
     48    - Dimensions for the Evette system: 1000 x 640 mm
     49    - Considering a crate and delivery by a logistics company, pump truck needed for transporting the crate around the campus. **Action** PJ to follow up with ST on the delivery.
     50    - Team members lined up to help with the stand, likely two Leo reps.
     51    - Prepared 'Why upright?' leaflets for the festival.
    3152  - Posters, TriFold/WWW docs/videos: RA, KG, EM
    32   - Plasma demonstrator             : WB 
     53    - KG enquired about the size of the poster - A0?
     54    - KG identified timeline for the video: first draft text video and poster - 23 Apr; graphics and poster display - May 15th, Feedback and last minute changes - May 23rd.
     55    - KG to get estimate for poster printing cost.
     56  - Plasma demonstrator (Quadrupole trap)             : WB
     57    - Main trap demo size ~ 0.5m x 0.3m, with control box to go under the table.
     58    - Either a student/postdoc from WB's group or a postdoc from Swansea to attend the festival. They could also train other people to operate the demo. Timeline on confirming the person to unclear, due to visa issues. **Action** PJ to chase this up.
     59    - Transport: WB potentially available to travel by car to bring the equipment to IC (last week of April, first two weeks of May). Alternatively, could use a shipping service or find someone else travelling from Manchester to London that are physically equipped to transport to equipment. **Action** PJ to follow up.
    3360  - Gathering statistics            : KG, KL
     61
    3462
    35633. Timeline: