= GERF25 planning meeting; 02Apr25, 15:00 BST = **ZOOM:** https://cern.zoom.us/j/62425599272?pwd=ZiBMjP37amcRHqUC75LQFBYmVw8s7k.1 == Notes == 1. __[wiki:Research/LhARA/GERF25/Meetings/2025-02-19 Notes on the last meeting]__ \\ // Actions//: * **PJ/KL**: Coordinate compilation of equipment list. * **Done.** * **PJ**: add the training requirement into the event/personnel planning. * **Done.** * **MP**: broker call with Leo personnel. * **Done.** * **KL**: Find out the survey questions being collected centrally to feed into the definition of our survey. * **Underway.** 2. Topics and leads: \\ [raw-attachment:2025-02-05-GERF-001-r1.pdf First planning document] \\ Collect by topic: - Principal milestones (including transport where appropriate) - Costs estimates, what's covered and not covered - Size/storage needs \\ Topics: \\ - CNRS/Santiago/EU : AFR/KL/All - No update. AFR to meet with EM and Yolanda on Friday. **Action**: Draft up timeline with principal milestones and follow up with KL following the discussion on Friday. - Extended reality : WS (Email update) - Unable to deliver the AR activity, due to lack of time/resources. VR activity goes ahead as planned. Need to consider an alternative method for surveying visitors. **Action**: Draft up timeline with principal milestones and provide a cost estimate. - Equipment list (not final): - Padded seat with back rest (in a 2x2m space) - Optical / lens cloths - Wet wipes (cleaning between visitors) - Power point for continuous supply (2-3 hrs on battery is insufficient) - 3D model : WS (Email update) - Propose components have magnetic base (magnetic tape), to be assembled on a magnetic whiteboard. - Equipment list (not final): - 1m x 1.2m (or similar) magnetic white board to be laid flat on a table - Table (needed for lego model anyway) - Whiteboard pens - Metre stick (drawing LhARA outline on the whiteboard) - Whiteboard eraser - **Action** Draft up timeline with principal milestones and provide a cost estimate. - Lego model : KG, WS - Started work based on the CAD model. Initial cost estimate £63. Estimate the whole process to take no more than a month, but currently prioritising the video. After the LEGO model is complete and more accurate cost estimate, to ask STFC if they provide funding support. - **Action** To define timeline, update cost estimate, identify STFC funding support. - Eve Chair : ST, TU (Email update) - Dimensions for the Evette system: 1000 x 640 mm - Considering a crate and delivery by a logistics company, pump truck needed for transporting the crate around the campus. **Action** PJ to follow up with ST on the delivery. - Team members lined up to help with the stand, likely two Leo reps. - Prepared 'Why upright?' leaflets for the festival. - Posters, TriFold/WWW docs/videos: RA, KG, EM - KG enquired about the size of the poster - A0? - KG identified timeline for the video: first draft text video and poster - 23 Apr; graphics and poster display - May 15th, Feedback and last minute changes - May 23rd. - KG to get estimate for poster printing cost. - Plasma demonstrator (Quadrupole trap) : WB - Main trap demo size ~ 0.5m x 0.3m, with control box to go under the table. - Either a student/postdoc from WB's group or a postdoc from Swansea to attend the festival. They could also train other people to operate the demo. Timeline on confirming the person to unclear, due to visa issues. **Action** PJ to chase this up. - Transport: WB potentially available to travel by car to bring the equipment to IC (last week of April, first two weeks of May). Alternatively, could use a shipping service or find someone else travelling from Manchester to London that are physically equipped to transport to equipment. **Action** PJ to follow up. - Gathering statistics : KG, KL 3. Timeline: - Feb25: -- Done. - Identify key elements in presentation/stand, identify leads and ask them to prepare a timeline so a schedule can be generated. - Preparation for Festival: - 30May25: Exhibits/stand to be ready, and set up at IC, one week before: - 04Jun25: “Rehearsal session”, e.g. in Level 8 Common Room - __GERFoS: 07/08 June 2025__ \\ **Agreed** need tracking milestones by our next meeting. 4. __DONM__ \\ 16APr25 -- 15:00 BST 5. __AoB__ \\ ---- == Information from organisers: == * [raw-attachment:GERF-2025_Equip-order_College-Main-Entrance-teams.xlsx Equipment list] * [raw-attachment:GERF-EU-zone-floorplan.docx Floor plan] * [raw-attachment:Mandatory-GERF-2025-training-engaging-audiences-with-your-research.pdf Mandatory training(!)] \\ ---- == Summary of actions: == ----