Version 68 (modified by 19 months ago) ( diff ) | ,
---|
LhARA Project Management Board pages
The LhARA Work Package Managers (WPM) group was formed to prepare the first significant proposal prepared by the LhARA collaboration over the summer of 2021. The WPM group plays a role analogous to that of the Technical Board in a typical large collaboration.
Representation: the membership of the Work Package Managers Group may be found here.
Communication: send an email to all WPMs using the following mailing list on the Imperial mail server (Imperial.ac.uk): ccap-lhara-wpm@…
Meetings
Proposal; status and development
PMB Document Library
Sharepoint
Research/DesignStudy/WPMGroup/Document-Library
Wiki Files
Research/DesignStudy/WPMGroup/WPM-WIki-Documents
2021 Costing Documents
15Oct21: Templates for work package cost sheet and risk register:
09Sep21: Skeleton update (PDF, WORD): Added second lead for WP6; minor update to heading in A-7
09Sep21: Skeleton (PDF, WORD): first version
Documentation, background information, and useful links
STFC Project Management framework
Attachments (11)
- 2021-08-27-LhARA-proposal-d0.1.pdf (271.6 KB ) - added by 3 years ago.
- 2021-08-05-LhARA-proposal-template.docx (25.7 KB ) - added by 3 years ago.
- 2021-09-09-LhARA-proposal-d0.2.docx (28.3 KB ) - added by 3 years ago.
- 2021-09-09-LhARA-proposal-d0.2.pdf (274.1 KB ) - added by 3 years ago.
- 21_10_15_RiskReg.xlsx (16.0 KB ) - added by 3 years ago.
- 2021-10-15-LhARA-WP1.xlsx (23.1 KB ) - added by 3 years ago.
- 21_11_02_RiskReg.xlsx (33.0 KB ) - added by 3 years ago.
- 21_11_03_RiskReg.xlsx (33.5 KB ) - added by 3 years ago.
-
LhARA1-DK.mpp
(528.0 KB
) - added by 3 years ago.
LhARA proposal M project
- LhARA1-DK_21_12_01.mpp (1.1 MB ) - added by 3 years ago.
- LhARA-Gov-PMB-2023-05.pdf (224.8 KB ) - added by 15 months ago.
Download all attachments as: .zip