= LhARA & LMU second meeting: 23Feb23; 14:30 GMT = **ZOOM**: ​https://cern.zoom.us/j/68763369382?pwd=V05jYjM0MHNTeHFwQjdYbG1hSDhPdz09 == Agenda == 1. Introduction: KL 2. LION beamline simulation update: MM 3. Scintillating fibre planes: JMcG 4. Liquid scintillator: JMcG (on behalf of Peter Hobson) 5. Next steps: **All** 6. //AOB//: **All** ---- == Notes == 1. Simulation outcomes are very close to the expected results 2. Some things are still missing from the simulation (see below) 3. Scintillating fibre planes cause a lot of problems in both construction and influence of the acoustic signal 4. The use of liquid scintillator seems like the best approach Next Steps: 1. Simulate the exit window in BDSIM 2. Simulate the air and Kapton foil in k-Wave 3. Simulate a collimator in BDSIM, placed at the end of the beamline but before the exit window 4. Compare with experimental results