Changes between Version 4 and Version 5 of Research/LhARA/IonAcoustic/Meetings/2024/08-21


Ignore:
Timestamp:
Aug 24, 2024, 9:19:58 AM (3 months ago)
Author:
mm2321
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/IonAcoustic/Meetings/2024/08-21

    v4 v5  
    1717----
    1818== Notes ==
     19
     201. Maria made the picoscope work with python. The software saves and timestamps the data according to the trigger.
     21
     222. The cameras don't recognise the trigger. Ken and Peter will help in the lab on Friday.
     23
     243. Peter will come to Imperial on Friday to assemble the optics for the scintillating fibre detectors. These will be ready for Munich.
     25
     264. Maria will estimate the number of boxes, dimensions and weights for the RAL transport form. ICR has been decided as the collection point. Jeff will fill out the form with his details and the ICR address for pickup.
     27
     285. The first experiment will be with the scintillating fibre detectors since it will be very quick. The fibres will be inserted into the SmartPhantom from London. The next experiments will be with low-cost equipment to test EMP. The liquid scintillator experiments should start on day 2.
     29
     30
     31
     32
     33