Changes between Version 7 and Version 8 of Research/LhARA/IonAcoustic/Meetings/2026/02-25
- Timestamp:
- Feb 27, 2026, 3:12:01 PM (3 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/IonAcoustic/Meetings/2026/02-25
v7 v8 7 7 1. Optimisation & FEMM results- C.D 8 8 9 2. Progress with reading Calvin’s RCIFbased energy deposition data into the ZEMAX SmartPhantom model- P.H9 2. Progress with reading Calvin’s RCIF-based energy deposition data into the ZEMAX SmartPhantom model- P.H 10 10 11 11 3. //AOB// / Follow up questions for Maria … … 13 13 ---- 14 14 15 Attended: KL, CD, JM 15 Attended: KL, CD, JM, PH, JB, CW, JS 16 16 17 17 == Meeting Notes == … … 19 19 1. Optimisation & FEMM results- slides attached --> [raw-attachment: LION_12-02_Update.pptx]- C.D 20 20 21 2. Progress with reading Calvin’s RCIFbased energy deposition data into the ZEMAX SmartPhantom model- slides attached --> [raw-attachment: LhARA_25Feb26.pdf]- P.H21 2. Progress with reading Calvin’s RCIF-based energy deposition data into the ZEMAX SmartPhantom model- slides attached --> [raw-attachment: LhARA_25Feb26.pdf]- P.H 22 22 23 3. Discussion of next steps 23 3. Discussion of next steps, recreating with k-wave, comparison between linear optics/BDSIM simulations on k-wave vs real results needs to be done, also need to check field map simulations match linear optic simulation --> TLDR- need to compare everything: linear optics, BDSIM, BDSIM with field maps & real results 24 24 25 25 == Future Plan == 26 27 1. Run MATLAB k-wave with results for optimal shifts/tilts & compare with results- M.M & C.D 28 29 2. Fix BDSIM field map time issue & compare with linear optics- C.D & J.M
