Changes between Version 7 and Version 8 of Research/LhARA/IonAcoustic/Meetings/2026/02-25


Ignore:
Timestamp:
Feb 27, 2026, 3:12:01 PM (3 months ago)
Author:
jmm119
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/IonAcoustic/Meetings/2026/02-25

    v7 v8  
    771. Optimisation & FEMM results- C.D
    88
    9 2. Progress with reading Calvin’s  RCIF based energy deposition data into the ZEMAX SmartPhantom model- P.H
     92. Progress with reading Calvin’s RCIF-based energy deposition data into the ZEMAX SmartPhantom model- P.H
    1010 
    11113. //AOB// / Follow up questions for Maria
     
    1313----
    1414
    15 Attended: KL, CD, JM
     15Attended: KL, CD, JM, PH, JB, CW, JS
    1616
    1717== Meeting Notes ==
     
    19191.      Optimisation & FEMM results- slides attached --> [raw-attachment: LION_12-02_Update.pptx]- C.D
    2020
    21 2.      Progress with reading Calvin’s  RCIF based energy deposition data into the ZEMAX SmartPhantom model- slides attached --> [raw-attachment: LhARA_25Feb26.pdf]- P.H
     212.      Progress with reading Calvin’s RCIF-based energy deposition data into the ZEMAX SmartPhantom model- slides attached --> [raw-attachment: LhARA_25Feb26.pdf]- P.H
    2222
    23 3.      Discussion of next steps 
     233.      Discussion of next steps, recreating with k-wave, comparison between linear optics/BDSIM simulations on k-wave vs real results needs to be done, also need to check field map simulations match linear optic simulation --> TLDR- need to compare everything: linear optics, BDSIM, BDSIM with field maps & real results
    2424
    2525 == Future Plan ==
     26
     271.      Run MATLAB k-wave with results for optimal shifts/tilts & compare with results- M.M & C.D
     28
     292.      Fix BDSIM field map time issue & compare with linear optics- C.D & J.M