Changes between Version 1 and Version 2 of Research/LhARA/RadiationBiology/Meetings/2024-08-23
- Timestamp:
- Aug 23, 2024, 12:22:58 PM (3 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/RadiationBiology/Meetings/2024-08-23
v1 v2 5 5 == Agenda == 6 6 7 1. Updates from DL (H.O, B.S, K.L): 7 1. Updates from DL (H.O, B.S, K.L):\\ 8 8 9 9 Materials provided by STFC: 10 11 10 6 quadrupoles (with option to go down) 12 11 Gradient 150 T/m … … 23 22 Thread size discussed- decided on M6 as preference 24 23 Maximum frame size 130mm across 25 26 27 24 Likely quadrupole cost 2k per quad 28 25 Budget available around 12k … … 33 30 Colin Whyte to arrange transport to Strathclyde 34 31 35 36 In-vacuum37 38 39 32 Materials provided by Strathclyde University: 40 41 42 33 Mounting plate arrangement within vacuum chamber - probably dead reckoning onto a single plate with perhaps dowels and discrete surface plate holes. 43 34 Description of alignment method, possibly laser through the aperture with Mylar targets? … … 47 38 48 39 Timeline: 49 50 40 Quotes end of August 51 41 Review early Sep with Ross and Clive Hill (+Ben etc) … … 59 49 Discussion to aim for end of November mounting to ensure beam time window not missed. 60 50 61 2. Discussion on quad attachment/alignment/mounting (All) 51 2. Discussion on quad attachment/alignment/mounting (All) \\ 62 52 63 53 R.G. proposes optical rail to mount all components on so it can be lifted vertically without disturbing Thompson. Weight calculations for each quad (rough estimate of a few lbs per quad, collimators assumed to be light) to be done to check weight baring. 64 54 65 3. Simulation updates (J.M) 55 3. Simulation updates (J.M) \\ 66 56 67 BDSIM initial simulations show somewhat a similar design to the linear optics . Proper side by side analysis is to be completed57 BDSIM initial simulations show somewhat a similar design to the linear optics for pencil beam with 0.3MeV spread. Proper side by side analysis is to be completed for a point source with limited spread. R.G. to send parameters from the SCAPA line both in input csv and real time readings from the beam for input into Linear Optics and BDSIM. [raw-attachment: BDSIM- PoPLaR Visuals.pdf BDSIM Visuals] 68 58 69 59 4. AOB \\