Version 1 (modified by 3 weeks ago) ( diff ) | ,
---|
LhARA PoPLaR meeting: 17Oct2024; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/92877706542?pwd=SVRnWUpYRDdOZVY2ZnBmM3grSnFpZz09
Agenda
- Hardware discussion:
Quad stages: Supplier has been reached out to for a quote for 2 xyz motorised stages for the quadrupoles.
Design (R.G): Demonstrates viewing window, manual insertion state for scintillator to monitor beam profile close to focus. Discussion of RCF- to use instead of Thompson parabola at plane of cells, Thompson used to set up beam. Kapton window before cells.
- Bio updates:
Carousel design finished. Conveyer belt like system, 10 cell plates at a time maximum as vertical suspension with little media results in cells drying. Suggestion to add RCF as one of samples- discussion of scintillator being used, both unlikely to be needed.
Discussion of copper activation for instrumentation- activate stack of copper in proton beam where cells would be, count gamma & measure half life.
- Beam simulations:
Decision was made to search for alternative quad positioning within 1.3m as to not interfere with Thompsons parabola positioning- good signal at current position. Decision was also made to look for a 2 quadrupole set up rather than 4 to save time/ money on initial experiments.
- AOB:
Discussion of meeting/half day for updates on all sides of PoPLaR. Poll sent out.