Research/LhARA/RadiationBiology/Meetings/2025-05-28
v4 v5 17 17 - The cell carousel should be placed up against the beam window, so can add the flange on the back. 18 18 - Lanex or RCF stacks can be placed in the beamline. 19 - ** Feature required for the RCF stack holder to confirm the orientation of the stack. **19 - A feature is required for the RCF stack holder to confirm the orientation of the stack. 20 20 - Could be done with a notch in the tube 21 21 - Or a fiducial added to each stack by a laser, which would require sending the design away along with a carousel. 22 - ** Fume Cupboard exhaust is "totally wrecked". **22 - Fume Cupboard exhaust is "totally wrecked". 23 23 - Plan B, if not fixed in time, is to mount the cells in the carousel in a different building and transport them the ~100m to the beamline in the carousel. 24 24 … … 54 54 55 55 8. Discussion of New Meeting Time 56 - Keep at 14:00 as default, but before each meeting, check if 3pm would be a preferred time.56 - Keep at 14:00 on Thursday as default, but before each meeting, check if 3pm would be a preferred time. 57 57 58 58 9. DoNM … … 63 63 64 64 === Summary of actions === 65 - Nudge delivery of PMQ frames65 - **HO**: Nudge delivery of PMQ frames 66 66 - **RW/RG**: Fiducial to be added to RCF stack holder or to stack to determine orientation post irradiation. 67 67 - **CD**: Investigate lower energy transmission and incorporate simulation of SCAPA proton spectrum to investigate off-energy particles. 68 68 - **RG/RW**: To share proton spectrum, new divergence model and beamtime timetable for CD and the wiki 69 - Troubleshoot access to editing wiki.69 - Troubleshoot access to editing the wiki. 70 70 71 71