Changes between Version 1 and Version 2 of Research/LhARA/RadiationBiology/Meetings/2025-06-12


Ignore:
Timestamp:
Jun 13, 2025, 9:44:48 AM (2 weeks ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2025-06-12

    v1 v2  
    1818  - Back-up would be a cabinet on the 5th floor. Colin to talk to the person who uses that, but no rush to use since there is the delay due to the laser and this cabinet is a recirculating one, so not as sterile as desired.
    1919 - Waste and plastic consumables:
    20   - Birmingham to order them and pay. Delivery to Strathclyde. Waste disposal needs coordination and might require someone to be trained at Strathclyde.
     20  - Jason to talk to the Fisher rep and get a plan of action for ordering and delivery of consumables to Strathclyde.
     21  - Colin to talk to the autoclave facility in the Wolfson building for Bio waste disposal, as the bench top one is not big enough.
    2122 - RCF stack fiduciary:
    2223  - Use a laser to cut a fiduciary
    23   - Maybe send to Chris for cutting (Keep Ken and Calvin in the loop).
     24  - Maybe send to "Chris" for cutting (Keep Ken and Calvin in the loop).
    2425
    25264. // PMQ Positioning: // CD, RG, JMcG \\
     
    4849 - **RW/RG**: Fix the laser :) and cut fiduciary into RCF stacks
    4950 - **BT/RW**: Send Calvin the proton energy spectrum.
    50  - Something with consumables and waste???
     51 - **JP**: Talk to Fisher and get a plan of action for the order and delivery of consumables to Strathclyde
     52 - **CW**: Speak to autoclave facility for bio waste disposal.
    5153
    5254