= LhARA radiobiology; meeting: 26Jun25; 14:00 BST = **Present:** CW, RW, RG, HO, CP, EM, JMcG, AFR, CD == Notes == 1. //[wiki:Research/LhARA/RadiationBiology/Meetings/2025-06-12 Minutes and actions]: // - CW: Check on exhausts and talk to the "owner" of the backup cabinet - **DONE** - BT/RW: Send Calvin the proton energy spectrum. - **STANDS** - JP: Talk to Fisher and get a plan of action for the order and delivery of consumables to Strathclyde - **STANDS** CW: Speak to autoclave facility for bio waste disposal. - **DONE** 2. //Strathclyde Updates: // RG, RW, CW \\ - Laser damage and beamtime: - No major update. - Still on for July run. - Characterising the source to begin ~the week of the 14Jul - Quad alignment and set up to be from 22Jul - 25Jul (21Jul is a bank holiday) - Include cell sample for this run. - Funding can extend until end of the financial year. - Need to change the times of no-cost extensions (Emma to chase Tony about this). - Bio phase to occur after September - Bio-safety cabinets - Fixed! - Recalibration to be completed in the next week - Waste and plastic consumables: - Plan confirmed to use the autoclave in the Wolfson building. - Need to train someone to carry the waste over. - Marie Boyd is the back up. - No update from Jason as off, but had been contacted by Marie. - RCF stack fiduciary: - Larger stack cut and notched - Smaller stack more tricky. - Can send to Rutherford for laser cutting 3. //Field mapping, preparation of PMQs: // HO/BS \\ - Everything delivered or on delivery to Strathclyde. - Expected by Monday (30Jun) - Marked with a sharpie to indicate which way is forward. - F quad has the lettering the right way around when placed correctly in beamline. 4. // PMQ Positioning/Beam optimisation: // CD, RG, JMcG \\ - Tony produced simulations with an average of 5.6KeV/um - Previous simulations of 10MeV had shown an average of 4.8KeV/um - Waiting for overlay from Tony to better understand distribution of LET 5. //Simulation update: // KL, CD \\ - G4 simulation of RCF stacks complete. - Verified with SRIM and in comparison with LLO. - Does not show the splitting effect that was hoped for - Further verification with TOPAS simulating an RCF stacks 6. //Bioprep: // EM/MH \\ - Cultures appeared to have survived. - Results will be ready before the next meeting 9. DoNM - 10Jul25 14:00 **BST** 10. AoB \\ - Ross' last meeting :( === Summary of actions === - All the elements for the beamline are now in place - **TP (and others?):** Chase up no-cost extensions - **RW:** Cut and notch smaller RCF stack - **TP:** Overlay previous LET distribution on newer - **CD/AFR:** Verify G4 RCF stack ----