= LhARA radiobiology; meeting: 14Jul25; 14:00 BST = **Present:** CW, RW, CP, EM, JMcG, AFR, CD, KL, DO == Notes == 1. //[wiki:Research/LhARA/RadiationBiology/Meetings/2025-06-26 Minutes and actions]: // - JP: Talk to Fisher and get a plan of action for the order and delivery of consumables to Strathclyde - **STANDS** - CD/AFR: Complete verification of RCF stack - **STANDS** 2. //Strathclyde Updates: // RW, CW \\ - Laser damage and beamtime: - Damage also includes a vacuum pipe that needs fixing, defines a new schedule - New Schedule: - Week 1: Get back to where we were a month ago with correct laser delivery to the target. - Week 2: Re-establish and troubleshoot proton generation. - Week 3: Work with the quads and some diagnostic testing in the PoPLaR configuration. - Opportunity for a full bio walkthrough. - Double check the autoclave waste - Highly dependent on week 1 and week 2 - Bio-safety cabinets: - Recalibration still required and unsure of schedule - RCF stack fiduciary: - Smaller stack proving to be tricky - Larger stack can be used as a viable back-up - Ken may be able to encourage CLF to help with smaller stack - Aligned with a cross-hair on carousel and a laser along the beam axis 6. //Bioprep: // EM/MH \\ - IF needs staining from the last experiments (14 vs 28 MeV) - Issue with Mylar remains - colony survival too variable to be reliable - Tested post-plating FaDu cells from Mylar following 28 MeV protons (0-4Gy) with reliable and consistent colony formation - To do - Rerun cyclotron test experiments comparing 14 and 28 MeV with post-plating method for both HeLa and FaDu - date TBD - To do - stain, image and analyse IF on Mylar 7. DoNM - 22Jul25 14:00 **BST** 8. AoB \\ - Present work to LhARA fortnightly tomorrow - CD: Updated SCAPA schedule - EM: Updates from latest experiment - CD: LMU work === Summary of actions === **EM:** Comparison of 14 and 28 MeV with post-plating method. Analyse IF on Mylar **CW:** Bio-cabinets need recalibration ----