25 | | - Energy Spectrum at cells |
26 | | - Energy Spectrum and Angular Divergence at Source |
27 | | - Update on next steps: |
28 | | - Alter PMQ/target mounts |
29 | | - Add position referencing systems to PMQ drives |
30 | | - Install cell rotation mount |
31 | | - Expected proton dose |
32 | | |
| 26 | - All the RCF scanned on the relevant scanner now |
| 27 | - Organise Calvin, Nick and Robbie to meet to discuss |
| 28 | - Robbie to send the RCF data to Tony as well - he can calculate the calibration curve |
| 29 | - Once we understand the dose: |
| 30 | - Organise Robbie, Emma and Jason to discuss irradiation plan |
| 31 | - Alter PMQ/target mounts |
| 32 | - ~5cm closer after moving the mounts |
| 33 | - Add position referencing systems to PMQ drives |
| 34 | - Robbie has built this in |
| 35 | - Install cell rotation mount |
| 36 | - Fine alignment and checking rotation works correctly still to be done |
| 37 | - Further updates: |
| 38 | - TP now setup to switch on quite quickly. Can pump it down easily. |
36 | | - Further discussion of uniformity? |
| 42 | - Mean dose drops by a factor of 10 minimum |
| 43 | - Diaza to sample transverse distribution at several points along the beamline |
| 44 | - Source production to be improved |
| 45 | - Calvin to investigate defocussing the quads further |
| 46 | |
| 47 | - Practicality of implementing a scattering foil |
| 48 | - For Biology |
| 49 | - Reduced mean dose only a problem if still aiming to do FLASH |
| 50 | - Physically |
| 51 | - SCAPA have an arm to use to place the foil in |
| 52 | - Simplest position is in the vacuum tube (or maybe entry to tube) |
| 53 | - Robbie to provide the viable positions of the foil in the beamline for simulations |
| 54 | - Can obtain 10um Gold easily (Goodfellas) |
| 55 | - Chris Spindloe to be the help if needed the transverse size to be reduced down |
| 56 | |
39 | | - Fix dates for dry-run |
40 | | - Propose dates for proper run |
41 | | - Discussion of the irradiation shot plan |
| 59 | - Dry-run |
| 60 | - Delayed due to hood availability |
| 61 | - To be done at the beginning of the actual run. |
| 62 | - Should not cause a delay to the actual run if the dry run cannot be completed |
| 63 | - Dates for actual run |
| 64 | - 27th Oct - 21st Nov |
| 65 | - Emma on annual leave 24th to 31st Oct |
| 66 | - Jason tied up on the week of 10th. Might be available on week of 3rd. |
| 67 | - Dates can be pushed back if necessary |
| 68 | - Plan for run |
| 69 | - First week is obtaining proton focus again |
| 70 | - Next two weeks is irradiation |