| 25 | | - Energy Spectrum at cells |
| 26 | | - Energy Spectrum and Angular Divergence at Source |
| 27 | | - Update on next steps: |
| 28 | | - Alter PMQ/target mounts |
| 29 | | - Add position referencing systems to PMQ drives |
| 30 | | - Install cell rotation mount |
| 31 | | - Expected proton dose |
| 32 | | |
| | 26 | - All the RCF scanned on the relevant scanner now |
| | 27 | - Organise Calvin, Nick and Robbie to meet to discuss |
| | 28 | - Robbie to send the RCF data to Tony as well - he can calculate the calibration curve |
| | 29 | - Once we understand the dose: |
| | 30 | - Organise Robbie, Emma and Jason to discuss irradiation plan |
| | 31 | - Alter PMQ/target mounts |
| | 32 | - ~5cm closer after moving the mounts |
| | 33 | - Add position referencing systems to PMQ drives |
| | 34 | - Robbie has built this in |
| | 35 | - Install cell rotation mount |
| | 36 | - Fine alignment and checking rotation works correctly still to be done |
| | 37 | - Further updates: |
| | 38 | - TP now setup to switch on quite quickly. Can pump it down easily. |
| 36 | | - Further discussion of uniformity? |
| | 42 | - Mean dose drops by a factor of 10 minimum |
| | 43 | - Diaza to sample transverse distribution at several points along the beamline |
| | 44 | - Source production to be improved |
| | 45 | - Calvin to investigate defocussing the quads further |
| | 46 | |
| | 47 | - Practicality of implementing a scattering foil |
| | 48 | - For Biology |
| | 49 | - Reduced mean dose only a problem if still aiming to do FLASH |
| | 50 | - Physically |
| | 51 | - SCAPA have an arm to use to place the foil in |
| | 52 | - Simplest position is in the vacuum tube (or maybe entry to tube) |
| | 53 | - Robbie to provide the viable positions of the foil in the beamline for simulations |
| | 54 | - Can obtain 10um Gold easily (Goodfellas) |
| | 55 | - Chris Spindloe to be the help if needed the transverse size to be reduced down |
| | 56 | |
| 39 | | - Fix dates for dry-run |
| 40 | | - Propose dates for proper run |
| 41 | | - Discussion of the irradiation shot plan |
| | 59 | - Dry-run |
| | 60 | - Delayed due to hood availability |
| | 61 | - To be done at the beginning of the actual run. |
| | 62 | - Should not cause a delay to the actual run if the dry run cannot be completed |
| | 63 | - Dates for actual run |
| | 64 | - 27th Oct - 21st Nov |
| | 65 | - Emma on annual leave 24th to 31st Oct |
| | 66 | - Jason tied up on the week of 10th. Might be available on week of 3rd. |
| | 67 | - Dates can be pushed back if necessary |
| | 68 | - Plan for run |
| | 69 | - First week is obtaining proton focus again |
| | 70 | - Next two weeks is irradiation |