Version 1 (modified by 8 days ago) ( diff ) | ,
---|
LhARA radiobiology; meeting: 21Aug25; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Agenda
- Minutes and actions:
- CD: Upload Technical Summary
- Done
- MH: Send Calvin the CAD of the cell carousel
- Done
- DA: Investigate increasing Mylar window thickness
- Done
- JP: Consumables plan
- Done?
- CW: Check service and testing of hoods
- Stands?
- JMcG/KL: Remove old calendar invites
- Stands?
- KL/CD: Update angular divergence in LLO
- Stands
- Strathclyde : BT, ED, RW
- Processing the RCF from Phase 1
- Energy Spectrum at cells
- Energy Spectrum and Angular Divergence at Source
- Update on next steps:
- Alter PMQ/target mounts
- Add position referencing systems to PMQ drives
- Install cell rotation mount
- Expected proton dose
- Discussion of the irradiation shot plan
- Simulation CD, DA, AF:
- Results of an Au foil in the beamline
- Further discussion of uniformity
- BioPrep EM, JP:
- Fix dates for dry-run
- Propose dates for proper run
- Beam Diagnostics KL, CD:
- Show RCF holder idea
- Ken update on a sparse beam diagnostic
- DoNM
- 16th October
- AoB