LhARA radiobiology; meeting: 21Aug25; 14:00 BST

ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1

Agenda

  1. Minutes and actions:
  • CD: Upload Technical Summary
    • Done
  • MH: Send Calvin the CAD of the cell carousel
    • Done
  • DA: Investigate increasing Mylar window thickness
    • Done
  • JP: Consumables plan
    • Done?
  • CW: Check service and testing of hoods
    • Stands?
  • JMcG/KL: Remove old calendar invites
    • Stands?
  • KL/CD: Update angular divergence in LLO
    • Stands
  1. Strathclyde : BT, ED, RW
  • Processing the RCF from Phase 1
    • Energy Spectrum at cells
    • Energy Spectrum and Angular Divergence at Source
  • Update on next steps:
    • Alter PMQ/target mounts
    • Add position referencing systems to PMQ drives
    • Install cell rotation mount
    • Expected proton dose
  • Discussion of the irradiation shot plan
  1. Simulation CD, DA, AF:
    • Results of an Au foil in the beamline
    • Further discussion of uniformity
  1. BioPrep EM, JP:
    • Fix dates for dry-run
    • Propose dates for proper run
  1. Beam Diagnostics KL, CD:
    • Show RCF holder idea
    • Ken update on a sparse beam diagnostic
  1. DoNM
    • 16th October
  1. AoB